BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20190917T180000Z
DTEND:20190917T190000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Business & Government Forum-TransitMatters
DESCRIPTION:This event is part of the official roll out of TransitMatters' latest report\, Regional Rail Proof of Concept: How to Provide Frequent\, All-day Service on the Worcester Line.\n\n\n\nThe Commonwealth faces a decade of significant vehicular mobility disruption on Interstate 90 (the Massachusetts Turnpike) due to anticipated reconstruction and relocation of the elevated highway approaching downtown Boston and private sector air rights developments in the same area. The need for frequent and reliable transit and rail mobility along this corridor is urgent.\n\n\n\nFollowing up to last year's report putting forth both short-term and long-term solutions for the Metro West-Worcester corridor. The ultimate goal is a transition to Regional Rail (a vision for fast\, frequent\, all day\, electrified service set forth in our Regional Rail report).
X-ALT-DESC;FMTTYPE=text/html:<span style="font-size:12px\;"><font color="#6f7287"><span style="letter-spacing: 0.5px\;">This event is part of the official roll out&nbsp\;of&nbsp\;</span></font><a href="http://transitmatters.org/" rel="nofollow noopener noreferrer" style="font-family: &quot\;Neue Plak&quot\;\, -apple-system\, BlinkMacSystemFont\, Roboto\, &quot\;Helvetica Neue&quot\;\, Helvetica\, Tahoma\, Arial\, sans-serif\; font-size: 14.9333px\; color: var(--eds-control\,#3659e3)\; text-decoration-line: none\; cursor: pointer\; padding-top: 0px\; letter-spacing: 0.5px\;">TransitMatters</a><span style="color: rgb(111\, 114\, 135)\; letter-spacing: 0.5px\;">&#39\; latest report\, Regional Rail Proof of Concept: How to Provide Frequent\, All-day Service on the Worcester Line.<br />\n<br />\nThe Commonwealth faces a decade of significant vehicular mobility disruption on Interstate 90 (the Massachusetts Turnpike) due to anticipated reconstruction and relocation of the elevated highway approaching downtown Boston and private sector air rights developments in the same area. The need for frequent and reliable transit and rail mobility along this corridor is urgent.<br />\n<br />\nFollowing up to&nbsp\;</span><a href="http://regionalrail.net/" rel="nofollow noopener noreferrer" style="color: var(--eds-control\,#3659e3)\; text-decoration-line: none\; cursor: pointer\; padding-top: 0px\; font-family: &quot\;Neue Plak&quot\;\, -apple-system\, BlinkMacSystemFont\, Roboto\, &quot\;Helvetica Neue&quot\;\, Helvetica\, Tahoma\, Arial\, sans-serif\; font-size: 14.9333px\; letter-spacing: 0.5px\;">last year&#39\;s report</a><span style="color: rgb(111\, 114\, 135)\; font-family: &quot\;Neue Plak&quot\;\, -apple-system\, BlinkMacSystemFont\, Roboto\, &quot\;Helvetica Neue&quot\;\, Helvetica\, Tahoma\, Arial\, sans-serif\; letter-spacing: 0.5px\;">&nbsp\;putting forth both short-term and long-term solutions for the Metro West-Worcester corridor. The ultimate goal is a transition to Regional Rail (a vision for fast\, frequent\, all day\, electrified service set forth in our Regional Rail report).</span></span>
LOCATION:Worcester Regional Chamber of Commerce Conference Room 311 Main Street\, Suite 200 Worcester\, MA 01608
UID:e.2083.10371
SEQUENCE:3
DTSTAMP:20260408T162633Z
URL:https://business.worcesterchamber.org/events/details/business-government-forum-transitmatters-10371
END:VEVENT

END:VCALENDAR
